Case Study: Ironside Constructions achieves improved subcontractor HSEQ accountability and significant time savings with HammerTech

A HammerTech Case Study

Preview of the Ironside Constructions Case Study

Ironside Increases Subcontractor HSEQ Accountability with HammerTech

Ironside Constructions, a Melbourne-based commercial and high-end builder, faced inconsistent HSEQ standards across multiple projects and many subcontractors. Teams managed disparate digital and physical documents, reporting was infrequent and incomplete, and leaders lacked real-time visibility to guide improvements. To solve this, Ironside Constructions adopted HammerTech’s HSEQ compliance platform to provide real-time access, measurable performance data, paperless site administration, and stronger subcontractor accountability.

HammerTech implemented a simple, configurable user interface and an API-driven KPI reporting system that centralized HSEQ data and eliminated on-site paperwork. The result: improved collaboration and compliance, less administrative time and more on-site production, and instant KPI feedback for continuous improvement. Measurable impacts include 270 hours saved per project on induction processes, a 0.5–1 day year-over-year reduction in close-out observations, and over 700 hours saved on HSEQ reporting since 2019.


Open case study document...

Ironside Constructions

Antoine Bachet

HSEQ Manager


HammerTech

28 Case Studies