Case Study: SINOPEC Ningbo Engineering achieves safer IGCC start-up with GSE Solutions simulation

A GSE Solutions Case Study

Preview of the SINOPEC Ningbo Engineering (SNEC) Case Study

SINOPEC Ningbo Engineering (SNEC) - Customer Case Study

SINOPEC Ningbo Engineering (SNEC) needed to optimize start-up and verify the complex control logic for its new IGCC plant, which combined multiple systems including Emerson DeltaV DCS, GE Mark VI, TRICONEX, and other PLCs. GSE Solutions provided a custom, full-scope high-fidelity dynamic simulation using SimSuite Pro to model the plant’s key process and auxiliary systems.

GSE Solutions used the simulator to validate and verify thousands of interlock logic diagrams before start-up, helping SNEC avoid costly downtime and improve operating readiness. The solution enabled design optimization and revisions to start-up procedures, contributing to the plant’s successful start-up and stable running.


Open case study document...

SINOPEC Ningbo Engineering (SNEC)

Han Zhenfei

Project Manager


GSE Solutions

22 Case Studies