GreenSpark Solar
7 Case Studies
A GreenSpark Solar Case Study
HARBEC, a plastics manufacturer, partnered with renewable energy vendor GreenSpark Solar to implement sustainable power solutions. GreenSpark provided its Engineering, Procurement, and Construction services for the project.
GreenSpark installed three renewable energy projects for HARBEC and its community: two solar arrays (248kW and 258kW) and an 850kW wind turbine. This infrastructure powers a sustainable micro-grid that supplies energy to HARBEC, GreenSpark Solar, and several other offices within the Wayne Industrial Sustainability Park complex.