Case Study: Patterson Associates achieves Len Lye Centre’s shimmering façade and OPEN BIM workflow with Graphisoft ARCHICAD & BIMx

A Graphisoft Case Study

Preview of the Patterson Associates Case Study

Patterson Associates - Customer Case Study

Patterson Associates was the architect for the Len Lye Centre, a 3,000 m² single-artist museum featuring a complex, highly reflective stainless-steel colonnade and strict MEP, acoustic and heritage-integration requirements. To tackle the façade’s complicated geometry, multi-discipline coordination and tight funding constraints, Patterson Associates used Graphisoft’s ARCHICAD and BIMx as core design and collaboration tools.

Graphisoft’s ARCHICAD (with Teamwork, Shell/Morph tools and OPEN BIM/IFC workflows) and BIMx enabled a single, detailed 3D live model that streamlined consultant exchanges, export to specialist tools, on-site coordination and exhibition planning. Using Graphisoft workflows Patterson Associates cut MEP/HVAC costs significantly—moving from two plant rooms to one saved a major portion of the budget—while BIMx supported site inspections and construction decision-making throughout the two-year build.


Open case study document...

Patterson Associates

Shane Taylor

BIM Manager


Graphisoft

58 Case Studies