Case Study: City of Düsseldorf achieves sustainable, digitally coordinated office design with Graphisoft Archicad and OPEN BIM

A Graphisoft Case Study

Preview of the City of Düsseldorf Case Study

City of Düsseldorf designs a 107,524 m² sustainable admin building with Graphisoft

The City of Düsseldorf required a new, highly sustainable Technical Administration Building to unify 3,000 employees from 17 municipal departments. The challenge was to design and coordinate this large-scale project digitally, ensuring seamless collaboration between multiple architecture and engineering firms. Graphisoft's Archicad and the OPEN BIM methodology were selected to meet this challenge.

Graphisoft's solution involved modeling the entire 32-story building in a single Archicad file, which served as the anchor point for data exchange. Using OPEN BIM, the team coordinated 45 separate discipline-specific models via IFC files into a single federated model. This approach enabled efficient collaboration, high-quality clash detection, and precise planning. The result was a masterclass in digital coordination, earning the project the prestigious buildingSMART International openBIM Award and a DGNB Platin pre-certification with an 85% fulfilment rate for its sustainability.


View this case study…

Graphisoft

146 Case Studies