Case Study: BlackHyve achieves simplified construction scheduling and real-time analytics with GoodData

A GoodData Case Study

Preview of the BlackHyve Case Study

How To Simplify Construction Scheduling With Advanced Analytics

BlackHyve is a fast-growing SaaS startup that manages the entire construction project lifecycle, with features like Jobwalks for real-time progress capture on job sites. The company struggled with limited analytics—relying on manual database queries and a few basic charts—and needed an embeddable, user-friendly analytics solution that preserved its existing data setup and came with vendor support.

Partnering with GoodData, BlackHyve implemented a Logical Data Model, workspace hierarchy, MySQL connector and embedded dashboards via the React SDK, with professional services helping automate the data pipeline. The solution delivered rich, drag-and-drop visualizations inside the app, rolled out in 2–4 weeks, saved about 80 weekly hours of manual graphing, and provided customers with timely, actionable insights and improved accountability.


Open case study document...

BlackHyve

Chris Gibson

Principal Software Engineer


GoodData

95 Case Studies