GoFormz
136 Case Studies
A GoFormz Case Study
A-Lert Construction Services needed a better way to manage its paperwork-heavy quality control documentation and job-site forms. Director of Quality Richard Mitchell brought in GoFormz to replace manual processes and create a single digital interface for organizing, tracking, and submitting construction records.
GoFormz helped A-Lert Construction Services build dynamic mobile forms with conditional logic, database lookups, automatic calculations, and integrations with SharePoint, SQL, Power BI, and other tools. The result was faster documentation, less manual data entry, improved data accuracy, and real-time uploads; Mitchell said a job that once required a full team now takes only a fraction of a person’s time, while QC staff save an estimated one to two hours per day on paperwork.
Richard Mitchell
Director of Quality