Case Study: Whiting-Turner Contracting saves time and concrete costs with Giatec SmartRock

A Giatec Case Study

Preview of the Whiting-Turner Contracting Case Study

Whiting-Turner Contracting - Customer Case Study

Giatec worked with The Whiting-Turner Contracting Company on the construction of a hotel and casino in a remote location in North Carolina. The project's challenge was a significant delay in obtaining critical concrete strength data from lab tests, as the nearest testing facility was an hour away, which risked slowing down the entire construction schedule.

By implementing Giatec's SmartRock wireless sensors, the team gained access to real-time concrete strength data directly from the job site. This solution eliminated the long wait times for lab results, preventing delays of up to half a day. Furthermore, the accurate data allowed them to optimize their concrete mix design, saving approximately $4 per yard and nearly $40,000 in total. Giatec's technology and support enabled the project to proceed more efficiently and cost-effectively.


View this case study…

Giatec

40 Case Studies