Case Study: Sundt Construction achieves 40% cooling material savings with Giatec SmartRock sensors

A Giatec Case Study

Preview of the Sundt Construction, Inc. Case Study

Sundt Construction, Inc. - Customer Case Study

Sundt Construction, Inc. faced a significant challenge while building an underground stormwater reservoir for the San Diego International Airport. The project's mass concrete elements were at high risk of thermal cracking due to heat generated during curing, and the team needed to continuously monitor internal temperatures and temperature differentials to ensure the structure's long-term durability.

To address this, Sundt utilized Giatec's SmartRock wireless temperature sensors and their full ecosystem, including the SmartHub device and Giatec 360 cloud platform. This solution provided real-time, accurate data and automated gradient analysis, saving the field engineer considerable time. The implementation by Giatec allowed Sundt to optimize their cooling requirements, resulting in a 40% savings on cooling materials for the project.


View this case study…

Sundt Construction, Inc.

Jackie Odom

Field Engineer


Giatec

40 Case Studies