MCS Property LLC faced significant challenges constructing a high-rise mixed-use development in Ulaanbaatar, Mongolia, due to the region's harsh winters. Their traditional method of monitoring concrete curing with thermocables was unreliable, prone to failure, and lacked robust reporting. They turned to Giatec for a solution, seeking to ensure concrete strength targets were met on schedule to avoid costly delays and structural risks.
Giatec provided its SmartRock wireless sensors, which delivered real-time data on concrete temperature and strength. This solution allowed MCS Property to prevent freezing damage and make data-driven decisions. The use of Giatec's technology resulted in the concrete reaching target strength 2.5 days faster than traditional methods, saving an estimated 25 days on the overall project and preventing extra costs.