Giatec
40 Case Studies
A Giatec Case Study
Hunnu Concrete LLC, a concrete manufacturer in Mongolia, faced significant challenges maintaining temperature control during mass concrete pours for its Sky Garden Residence project. The cold climate and tight deadlines made expensive heating controls necessary, but the team struggled with temperature spikes and inaccurate data from mechanical wires. Furthermore, their required cube testing for strength provided infrequent and unreliable data, limiting their ability to monitor in-situ conditions effectively. They turned to vendor Giatec for a solution.
Giatec provided its SmartRock wireless sensors to monitor concrete temperature and strength in real-time. This allowed Hunnu to instantly identify rising temperatures and adjust the mix with cold water to maintain the required 70 degrees Celsius, ensuring proper curing. The solution provided accurate data, improved collaboration with stakeholders, and established Hunnu as an innovative market leader. Giatec's technology helped Hunnu successfully complete the project with consistent strength development.