Heidelberg Materials UK faced the challenge of repairing the Petteril Bridge after a train derailment, which required a pumpable, high early strength waterproof concrete. The project demanded a fast turnaround to reopen a critical railway route, but their traditional method of using lab test cubes to determine concrete strength would cause significant delays. To meet the tight deadline, they utilized Giatec's SmartRock® wireless concrete sensors.
The solution implemented by Giatec provided Heidelberg Materials UK with real-time, 24/7 strength data, which was crucial for monitoring the concrete's curing process on-site. This eliminated the waiting time for cube test results and enabled faster decision-making. Using the SmartRock sensors and dashboard, the repairs were completed confidently and without delays, allowing the bridge to successfully reopen in just seven weeks.