TLI Group, a utility infrastructure consultancy and construction company serving Ireland and the UK, needed a better way to manage field work across multiple project types. Before GeoPal, the team relied on paper spreadsheets and manual re-entry at the office, which made it difficult to keep up with fast-moving jobs, capture data accurately, and track health and safety metrics in real time.
GeoPal provided TLI Group with a configurable mobile workflow and field work management solution that replaced paper processes and connected data directly from site to back-office systems. As a result, TLI Group achieved 100% visibility over field work and compliance, reduced admin personnel by 75%, and reached 97–98% average productivity levels, while also improving reporting, safety response, and decision-making with real-time information.
Cormac Howley
Project Manager SIRO FTTB