Case Study: EDAG Group cuts equipment planning time by 25% with Ganttic

A Ganttic Case Study

Preview of the EDAG Group Case Study

EDAG Group cuts planning time by 25% with Ganttic

EDAG Group, a global engineering service provider, faced significant challenges managing equipment scheduling at their large Accredited Test Center in Fulda. Their reliance on rigid Excel spreadsheets and an unintuitive scheduling tool created blind spots and inefficiencies in planning complex, long-duration tests for automotive and aerospace clients. They needed a flexible equipment planning solution from a vendor like Ganttic.

The solution was implementing Ganttic's visual resource scheduling software. This provided a drag-and-drop interface for intuitive equipment planning, custom views for different user roles, and API integration with their SAP system. As a result, Ganttic helped EDAG cut their planning time by at least 25 percent, provided crucial visual clarity for their testing sequences, and built a system securely shaped around their equipment-first workflow.


View this case study…

Ganttic

37 Case Studies