Case Study: a US-based pharmaceutical manufacturer achieves 100% quality and on-time artwork updates for 1,500+ injectables with FREYR

A FREYR Case Study

Preview of the US-Based Pharmaceutical Manufacturer Case Study

US-Based Pharmaceutical Manufacturer achieves 100% quality in 2 months with FREYR

The US-based pharmaceutical manufacturer faced the challenge of urgently updating over 1,500 artworks for its injectable products due to an Adobe update. Their internal team lacked the resources and bandwidth to complete this massive, compliance-sensitive project within the strict two-month deadline. They reached out to their existing partner, FREYR, for support with this rapid artwork update solution.

FREYR implemented a meticulous end-to-end artwork update process, expertly overcoming technical hurdles. The solution achieved 100% quality and a 98% right-first-time rate while ensuring a 100% on-time delivery. FREYR successfully updated all artworks within the two-month timeframe, providing comprehensive and error-free support for the client.


View this case study…

FREYR

38 Case Studies