Case Study: DP Wagner achieves faster, lower-cost shipping with FreightPOP and Acumatica

A FreightPOP Case Study

Preview of the DP Wagner Case Study

DP Wagner cuts shipping costs 30% with FreightPOP

DP Wagner, a U.S.-based manufacturer of wall and surface repair products, faced operational inefficiencies as it scaled. Its disconnected shipping systems created re-entry work and slow handoffs, and a lack of native shipping flow in its new Acumatica ERP limited automation and visibility. The company partnered with FreightPOP to find a unified shipping and warehouse management solution.

FreightPOP provided a bi-directional integration with Acumatica, creating a unified workflow for rate shopping, booking, label generation, and tracking. This solution enabled DP Wagner's five-person team to manage over 2,150 monthly shipments without adding headcount. The results with FreightPOP included a 30% reduction in shipping costs, a 95% reduction in processing time, 15% savings from freight invoice auditing, and a 40% improvement in on-time deliveries.


View this case study…

FreightPOP

21 Case Studies