Case Study: 27J Schools optimizes facility planning with FOS of CannonDesign

A FOS of CannonDesign Case Study

Preview of the 27J Schools Case Study

27J Schools plans 5- and 10-year facility repairs across 1.6M sf with FOS of CannonDesign

The customer, 27J Schools, faced the challenge of preparing for bond planning deadlines and needed a comprehensive assessment of its extensive facilities. FOS of CannonDesign addressed this by performing a district-wide facility condition assessment (FCA) on an accelerated timeline.

The solution involved a detailed FCA that analyzed data across all building disciplines and outdoor amenities to develop 5- and 10-year repair and replacement recommendations. As a result, FOS of CannonDesign provided the district with actionable deficiency records and accurate cost estimates, enabling them to identify, consolidate, and strategically plan future bond projects for their 1.6 million square feet of facilities across 24 sites.


View this case study…

FOS of CannonDesign

41 Case Studies