Case Study: Plan International saves 15% of IT time and avoids costly disk upgrades with Fortra

A Fortra Case Study

Preview of the Plan International Case Study

Halcyon Saves Time and Dodges Expensive Disk Upgrades at Plan International

Plan International, a child‑centered NGO operating in 60 countries, needed to maximize system availability while operating with minimal IT resources. With systems running near capacity, after‑hours support was high and disk space and spooled file storage were particular pain points.

Plan replaced outdated tools with four Halcyon products—Disk Space Manager, Spooled File Manager, Advanced Job Scheduler and Restricted Task Manager—to automate jobs, archive spooled reports to PDF, and run unattended weekly backups. The changes freed about 15% of support time, increased available disk space, dramatically reduced stored spooled files and avoided an expensive disk upgrade.


Open case study document...

Plan International

Max Charman

System Support Manager


Fortra

376 Case Studies