Case Study: BorgWarner achieves 4.3% increase in productivity in 6 months with FORCAM

A FORCAM Case Study

Preview of the BorgWarner Case Study

Borgwarner 4.3% increase in productivity In 6 months

BorgWarner Cooling Systems, the Markdorf (GER) subsidiary of automotive supplier BorgWarner, faced limited shop‑floor transparency and inconsistent processes across its 40 machines and sought to standardize operations, synchronize production and boost efficiency. To tackle these challenges they engaged FORCAM and adopted FORCAM FORCE™ shop‑floor management technology.

FORCAM delivered a custom production management system that collects machine and operating data, integrates real‑time information with SAP ERP and visualizes KPIs in the FORCAM Cockpit to support lean/CIP workflows. The FORCAM implementation enabled objective monitoring, bottleneck analysis and improved scheduling, yielding a measurable 4.3% increase in productivity within six months along with better OEE, reduced cycle/setup times and greater operational transparency.


Open case study document...

BorgWarner

Martin Strehl

Lean Management Coordinator


FORCAM

14 Case Studies