Case Study: Verto Homes achieves streamlined project management and on-site collaboration with Fonn

A Fonn Case Study

Preview of the Verto Homes Case Study

Award-winning house builder using Fonn to power-up its project management

Verto Homes, an award‑winning zero‑carbon house builder, needed a single, cost‑effective system to host construction documents and site records—especially to manage Part L regulation changes effective on-site in June 2023. After finding previous platforms charged per project and added hidden costs while lacking formal RFI and snagging workflows, Verto Homes chose Fonn’s document hosting/construction management platform to centralise drawings, reports and site records across multiple projects.

Fonn was implemented with bespoke file structures and on-site training, and Verto now uses the platform for planning and construction drawings, reports and mobile access; adoption was rapid (one bricklayer was observed reading plans on his phone on-site) and the system provides a clear audit trail for revisions, reducing ambiguity in disputes. Verto Homes credits Fonn’s easy-to-use app and responsive CSM support with streamlining collaboration, faster on-site decision‑making and improved document control.


Open case study document...

Verto Homes

Errol McKinon

Verto Homes


Fonn

14 Case Studies