FMX
86 Case Studies
A FMX Case Study
Broadmoor Baptist Church was facing challenges with a cumbersome email-based work order system and a separate event scheduling tool that had lost its integration with their building automation system (BAS). This made it difficult to track maintenance and impossible to automatically control lighting and HVAC for events. They turned to FMX for a solution.
FMX implemented a user-friendly system that integrated work orders and event scheduling, including a direct connection to the church's BAS. This allowed for the automatic control of equipment based on the event calendar. As a result, Broadmoor Baptist Church saved $5,500 monthly in utility costs and reduced their request approval time by 78%, thanks to FMX.