Case Study: AGL Energy improves power plant inspections with Flyability’s Elios 3

A Flyability Case Study

Preview of the AGL Energy Case Study

AGL Energy saves hundreds of thousands of dollars with Flyability's Elios 3

AGL Energy, Australia's largest private electricity generator, faced the challenge of inspecting hazardous and hard-to-access energy infrastructure, such as long penstocks and high-up steam nozzles, while keeping staff safe from confined space and work-at-height risks. To meet this challenge, they turned to Flyability and integrated the Elios 3 drone into their inspection processes.

The solution from Flyability involved using the Elios 3 for remote inspections, leveraging its LiDAR and lighting to survey a collapsed penstock void and assess infrastructure. This provided AGL with precise data, turning guesswork into certainty. The results were significant, with Flyability's solution reducing inspection times by up to 80%, saving hundreds of work hours, and cutting costs by hundreds of thousands of Australian dollars during planned shutdowns, all while dramatically improving worker safety.


View this case study…

Flyability

114 Case Studies