Case Study: Consolidated Power Projects achieves a 43% reduction in wind farm inspection time with Fluix

A Fluix Case Study

Preview of the Consolidated Power Projects Case Study

Consolidated Power Projects Reduces Wind Farm Inspection Time by 43%

Consolidated Power Projects (CPP), a turnkey high‑voltage contractor in Australia, faced a massive paperwork burden managing remote sites like the 53‑turbine Mt Emerald Wind Farm: more than 600 paper forms and 200 drawings per project, slow manual workflows, high printing/handling costs, and pressure to cut project costs and improve data turnaround. To address this, CPP engaged Fluix and its document workflow management solution to digitize and streamline field processes.

Fluix converted CPP’s paper forms and drawings into accessible digital documents with automated workflows, real‑time site tracking, and customizable reporting. As a result Fluix helped CPP digitize and route 9,000+ documents, deploy 226 automated workflows, reduce wind farm inspection time by 43% (vehicle checklist time fell from 22 to 12.5 minutes), eliminate printing costs and lost documents, and save over 1,400 labor hours—making inspections auditable and project reporting faster and more reliable.


Open case study document...

Consolidated Power Projects

Paul Wilson

Project Manager


Fluix

30 Case Studies