Titan Freight Systems, a regional leader in truckload delivery in the US Northwest, faced the challenge of managing electricity costs for its heavy-duty electric vehicle fleet. Their utility rate was dependent on staying below a strict site power threshold. Without a way to manage charger usage and avoid peak demand charges, their electricity costs would have been prohibitively high. To address this, they turned to Flipturn's charging management system and its site power management functionality.
Flipturn's solution used AI to dynamically balance power across multiple chargers, ensuring the site's total consumption stayed under the 200 kW limit required for a lower utility rate. This allowed Titan to qualify for the cheaper rate, slashing their average electricity cost from over $0.40 per kWh to $0.18 per kWh, a reduction of over 50%. The implementation by Flipturn was critical to making their EV fleet profitable.