Flexera
105 Case Studies
A Flexera Case Study
Comcast Cable’s Central California group needed to open a new Sacramento call center with 600 PCs and migrate 100+ legacy applications from Windows NT to Windows 2000 Active Directory on an aggressive timeline. Their existing CA Unicenter tooling couldn’t handle the complex repackaging and deployment requirements needed to meet the deadline.
After evaluating options, Comcast chose Flexera’s AdminStudio for its SMS 2003 integration and packaging capabilities. Purchased two weeks before opening, AdminStudio let the team repackage applications into MSI, resolve conflicts, run pre-deployment tests and deploy updates quickly—resulting in all 600 machines running correctly within 72 hours, standardized installations, reduced packaging time and lower IT costs.
Darrin Veit
Technologist II, Comcast Cable