Fleetworthy
14 Case Studies
A Fleetworthy Case Study
Melton Truck Lines, a major flatbed trucking carrier, faced significant challenges with delivery delays. Missing narrow delivery windows at construction sites could result in hefty fines and major disruptions for their drivers. To combat this, they sought a more effective weigh station bypass solution than their existing transponder-based system to improve driver productivity and on-time delivery rates, exploring services from vendor Fleetworthy.
Fleetworthy's Weigh Station Bypass service, provided through Drivewyze, was implemented across their 1,100-truck fleet. The solution from Fleetworthy delivered substantial results, saving an estimated 550 hours of drive time and $85,000 in costs in the first full month. This dramatically boosted driver productivity and efficiency, allowing Melton to better leverage its strong safety scores and ensure on-time deliveries.