Case Study: a US-based plumbing firm achieves accurate BIM 3D modeling and clash coordination with Flatworld Solutions

A Flatworld Solutions Case Study

a US-based plumbing firm completes BIM and MEP modeling in 8 weeks with Flatworld Solutions

The client, a US-based plumbing firm, required the conversion of 2D piping drawings into Revit BIM 3D models for a large-scale school project. Their challenges included coordinating clash detection with multiple vendors and ensuring a flawless design for safety. Flatworld Solutions was engaged to provide its building information modeling services to address this need.

Flatworld Solutions implemented a dedicated team that converted the 2D files into 3D models using Revit and coordinated the project using Autodesk BIM 360. Their solution included ongoing clash detection management with other vendors. The project was completed in just eight weeks with excellence and accuracy. Flatworld Solutions delivered a cost-efficient result that met the client's stringent requirements for timing and coordination.


View this case study…

Flatworld Solutions

378 Case Studies