FIMER
24 Case Studies
A FIMER Case Study
Rotokauri Primary School in New Zealand sought to reduce its energy costs and environmental footprint by installing a solar system, while also creating a learning opportunity for its students. The school engaged FIMER reseller Solar Partners NZ to design a solution, which utilized a FIMER PVS-15 inverter.
The FIMER PVS-15 inverter was selected for its safety, reliability, and advanced monitoring capabilities. The installed system generated over 3.5 MWh of energy in its first three months and is estimated to produce over 15 MWh annually, saving the school money and reducing its carbon emissions by an estimated 13 tonnes of CO2 per year.