Case Study: TCG Construction achieves faster project closeouts with Fieldwire by Hilti

A Fieldwire by Hilti Case Study

Preview of the TCG Construction Case Study

TCG Construction Simplified punch lists and faster project closeouts with Fieldwire

TCG Construction, based in Hong Kong with offices in Macau and Taiwan, needed a more efficient way to manage snag lists, defect tracking, and site closeout processes across occupied fit-out and construction projects. In 2018, the company started looking for a user-friendly construction management tool and chose Fieldwire by Hilti to improve productivity and streamline site management.

Fieldwire by Hilti helped TCG Construction centralize defect management, drawings, photos, and reports on a mobile-friendly platform for all stakeholders. The results included faster project closeouts, better communication, and major time savings: one 758-page deficiency report that would previously have taken three people two weeks was completed in about a week for inspection plus just 20–30 minutes to generate the report.


View this case study…

TCG Construction

Eric Wong

Project Director


Fieldwire by Hilti

53 Case Studies