Case Study: Losinger Marazzi achieves streamlined quality control and faster site reporting with Fieldwire by Hilti

A Fieldwire by Hilti Case Study

Preview of the Losinger Marazzi Case Study

Losinger Marazzi is using Fieldwire to build smart and sustainable infrastructure in Switzerland including residen8al projects such as Les Jardins du Couchant in Nyon

Losinger Marazzi, a major Swiss construction firm and Bouygues Construction subsidiary, faced complex coordination and quality‑control challenges on the Les Jardins du Couchant residential project (14 buildings, ~900 residents, €100M budget). With more than 20 subcontractors and a paper‑based inspection and reporting process, the team needed a mobile field management solution—so they deployed Fieldwire by Hilti to digitize inspections, punch lists and weekly task coordination.

By implementing Fieldwire by Hilti in April 2017, Losinger Marazzi tied tasks to drawings, attached photos, and generated instant reports from the phone—enabling more than 800 quality checks to date. The Fieldwire by Hilti rollout centralized task management for weekly meetings and safety inspections, cut reporting workflows from hours to seconds, and freed time for on‑site work while improving accountability and schedule tracking.


Open case study document...

Losinger Marazzi

Margot Lubeigt

Project Manager


Fieldwire by Hilti

53 Case Studies