Case Study: Techbau achieves 10x faster workflows with Fieldwire by Hilti

A Fieldwire by Hilti Case Study

Preview of the Techbau Case Study

Italian GC Techbau is 10x Faster With Fieldwire

Techbau, an Italian general contractor working on prefab logistics hubs and projects across Europe, needed a faster, more transparent way to manage project setup, communication, and quality control. Before adopting Fieldwire by Hilti, the team relied on Excel spreadsheets and siloed tools, which made inspections, updates, and document sharing slow and cumbersome.

By implementing Fieldwire by Hilti and equipping site managers with tablets, Techbau centralized project data, standardized inspections, and enabled real-time issue tracking with photos and checklists. The result was 10x faster quality control workflows, improved communication and transparency, management of 15 active projects, and 100% user satisfaction in an internal survey, with 30 users onboarded in less than three months.


View this case study…

Techbau

Mario Buscani

Technical Director


Fieldwire by Hilti

53 Case Studies