A Fieldwire by Hilti Case Study
Power Design, a nationwide electrical contracting and design-build firm, needed a better way to manage work-in-progress tracking and reduce the rework caused by inconsistent processes across teams. Before using Fieldwire by Hilti, some crews relied on Excel and other tools, which made field updates slow and coordination difficult.
With Fieldwire by Hilti and its custom task statuses, Power Design standardized workflows, enabled real-time updates from the field, and simplified onboarding and team alignment. The company reduced work-in-progress tracker setup time from six weeks to three hours and expects to save more than 10,000 hours over 18 months, while also cutting rework significantly.