Case Study: Blue Mountain Electric achieves real-time drawing control and reduced rework with Fieldwire by Hilti

A Fieldwire by Hilti Case Study

Preview of the Blue Mountain Electric Case Study

Blue Mountain Electric - Customer Case Study

Blue Mountain Electric, a Washington-based, veteran-owned industrial and commercial electrical contractor working on the $50M Hangar 6 expansion at NAS Whidbey Island, needed a reliable way to keep crews working from current drawings as sheet changes accelerated. Previous tools failed to preserve on-site markups or keep pace with frequent updates, so Blue Mountain turned to Fieldwire by Hilti — a construction management app offering plan versioning and mobile drawing control.

Fieldwire by Hilti provided conformed plan versioning, retained detailed on-site markups after sheet updates, and delivered lightning-fast access to current drawings on mobile devices. That solution let Blue Mountain maintain workflow continuity, keep up with rapid design changes, and substantially reduce rework and accidental effort on site, enabling the Hangar 6 work to proceed smoothly.


Open case study document...

Blue Mountain Electric

Nathan Howat

Vice President


Fieldwire by Hilti

53 Case Studies