Case Study: MJC Engineering accelerates hydrogen equipment production with FANUC CNCs

A FANUC America Corporation Case Study

Preview of the MJC Engineering Case Study

MJC Engineering cuts part lead times from 2 years to weeks with FANUC

MJC Engineering, a manufacturer of advanced CNC metal spinning equipment, faced significant challenges including long wait times for parts from its previous supplier and a lack of experience with FANUC controls. They needed to shorten machine build times to deliver a critical machine for hydrogen energy equipment on schedule. FANUC America Corporation provided a solution using their CNC controls, motors, and drives.

By implementing FANUC products, MJC Engineering received parts in weeks instead of years, drastically improving lead times. With engineering support from FANUC America, MJC's staff successfully transitioned to the new control platform. This allowed them to build a reliable and precise machine, which was delivered to their end customer on time, supporting Japan's hydrogen energy strategy.


View this case study…

FANUC America Corporation

103 Case Studies