A Facility Solutions Group Case Study
The Brauser Group faced significant challenges during the construction of a 23-story multi-use building in New York City, including tight spaces and a demanding timeline that required rethinking the main electrical systems. Facility Solutions Group (FSG) was brought in as the electrical contractor to address these issues and ensure on-time completion for the first tenants.
FSG utilized its experience and in-slab conduits to run main electrical systems below the floor, freeing up overhead space for other building systems. Through careful pre-planning and project management, FSG became the most efficient trade contractor on the project and was the only one to stay ahead of schedule, providing the general contractor and owner with peace of mind that the job was done right.