Case Study: UTMB League City Hospital achieves seamless hospital expansion with Facility Solutions Group

A Facility Solutions Group Case Study

Preview of the UTMB League City Hospital Case Study

UTMB League City Hospital expands with a 60-room wing with Facility Solutions Group

UTMB League City Hospital needed to expand its campus with a new five-story wing to address rapid growth challenges. Facility Solutions Group (FSG) was brought in as the electrical contractor to handle the complex electrical construction required for the new state-of-the-art facility.

Facility Solutions Group executed the electrical system integration, which included rebuilding the switchgear and implementing high-reliability power distribution. Despite the challenge of tying into the active hospital's electrical system, FSG successfully maintained continuous operations and delivered the project to everyone's satisfaction, ensuring the new facility was ready for comfort, safety, and future growth.