Facility Solutions Group
338 Case Studies
A Facility Solutions Group Case Study
TopGolf, a large entertainment venue, required comprehensive electrical construction and engineering services for a new 65,000-square-foot facility in Fort Worth, Texas. The challenge for Facility Solutions Group (FSG) was to provide the ground-up electrical work for this complex project, which included a high-tech driving range and full-service bar and restaurant.
Facility Solutions Group designed and built electrical systems for 102 climate-controlled hitting bays. FSG's Engineering & BIM team created the electrical drawings and plans, completing the project in nine months utilizing approximately 13,500 manhours. This successful collaboration has led to FSG providing similar electrical engineering services for numerous other TopGolf locations across the country.