Case Study: Taystee Life Science Building achieves energy-efficient biotech research capabilities with Facility Solutions Group electrical and control systems

A Facility Solutions Group Case Study

Preview of the Taystee Life Science Building Case Study

Taystee Life Science Building completes electrical buildout in 2024 with Facility Solutions Group

The Taystee Life Science Building required a state-of-the-art electrical infrastructure to support its transformation into a cutting-edge biotech research hub in New York City. Facility Solutions Group (FSG) was engaged to deliver a comprehensive electrical construction package, which included providing lab-grade power, emergency systems, and sophisticated lighting controls for the new facility.

Facility Solutions Group implemented robust electrical solutions, coordinating with other trades in the challenging Manhattan environment to ensure a safe and efficient project delivery. The result was a dynamic, energy-efficient facility completed in 2024 that is specifically tailored to power advanced biotech research and development, enabling innovation for the Taystee Life Science Building.


View this case study…

Facility Solutions Group

351 Case Studies