Facility Solutions Group
338 Case Studies
A Facility Solutions Group Case Study
Parker Industrial Grinding Atlanta, a client of Facility Solutions Group (FSG), sought to improve the lighting quality and safety in their warehouse space. Through the Georgia Power Small Commercial Direct Install Program, the owner, Tim Parker, was presented with an opportunity to upgrade his existing lighting with significant savings.
Facility Solutions Group conducted an on-site survey and implemented a lighting replacement solution that increased light output while reducing energy consumption. The project resulted in an annual kWh reduction of 9,557, saving the customer over $1,300 on their energy bills. With a total project cost of $3,388.71 and a substantial utility incentive, the customer's investment saw a return in under one year.