Leonard Water Treatment Plant powers 70 million gallons per day with Facility Solutions Group

The Leonard Water Treatment Plant required a robust electrical infrastructure to support its new high service pump station, a critical component designed to move 70 million gallons of water daily. Facility Solutions Group (FSG) was selected to provide the complete electrical construction necessary to ensure reliable operation for this expansion of regional water distribution capabilities.

Facility Solutions Group installed the main power feeds, switchgear, generator hookups, and control systems for the pump station. This electrical backbone delivered by FSG successfully supports the reliable movement of water across one of Texas's fastest-growing regions, strengthening the area's municipal infrastructure.


View this case study…

Facility Solutions Group

351 Case Studies