The customer, HCA Houston Healthcare, required expert electrical construction for its new Pearland Medical Center. Their challenge was to ensure the project was designed correctly from the outset, prioritizing safety, efficiency, and professionalism throughout the build. Facility Solutions Group (FSG) was brought in as the electrical contractor to meet this need.
Facility Solutions Group implemented the comprehensive electrical infrastructure for the 144,000 square-foot medical facility, which includes advanced surgical suites, an emergency department, and sophisticated imaging equipment. FSG leveraged its extensive experience, safety record, and well-trained teams to deliver the solution, ensuring the project was built correctly and to the high standards required for a modern healthcare environment.