Case Study: General Services Administration achieves $1.4M in energy savings with Facility Solutions Group LED lighting and controls

A Facility Solutions Group Case Study

Preview of the General Services Administration Case Study

General Services Administration - Customer Case Study

The General Services Administration faced the challenge of quickly mobilizing multiple teams of lighting engineers to perform an investment grade audit at five of its high-security buildings in New York City. This audit was a necessary first step for Trane to develop the lighting scope of work for a larger performance contract, and they enlisted Facility Solutions Group (FSG) to execute it.

Facility Solutions Group completed the audits and then collaborated with Trane to finalize the project's design and budgets. FSG was subsequently awarded the turnkey installation contract, utilizing their in-house electricians to replace 14,000 fixtures with new LED lights and controls. This project achieved significant energy savings of $1,400,000 for the customer.


Open case study document...

Facility Solutions Group

338 Case Studies