Case Study: City of San Antonio modernizes San Antonio International Airport Terminal 1 with Facility Solutions Group electrical construction

A Facility Solutions Group Case Study

Preview of the City of San Antonio Case Study

FSG was called upon to complete electrical construction services during an extensive remodel of the San Antonio International Airport

The City of San Antonio required extensive electrical construction services for a major remodel of its international airport terminal. This challenging project demanded a high level of expertise to modernize the facility's electrical systems while navigating the complexities of working within a secure operational environment. Facility Solutions Group (FSG) was selected as the electrical contractor to undertake this significant upgrade.

Facility Solutions Group executed a complete electrical overhaul of Terminal 1. Their comprehensive solution involved reinstalling the terminal's entire electrical system, installing new lighting, and implementing new paging and multi-user flight information display systems. A key aspect of the project was the careful temporary relocation and subsequent reinstatement of a security checkpoint with continuous power. The successful $3 million project modernized the airport's critical infrastructure.


Open case study document...

Facility Solutions Group

338 Case Studies