Facility Solutions Group
338 Case Studies
A Facility Solutions Group Case Study
The U.S. Army required a lighting upgrade at the main exchange on their Fort Dix post. Facility Solutions Group (FSG) was selected to undertake this project to modernize the facility's lighting system.
FSG implemented the solution by replacing over 1,000 fluorescent troffers and 12 HID high bay fixtures with new, energy-efficient LED lighting. The base was highly impressed with the results, specifically praising FSG's high-quality installation, professional workmanship, and excellent communication and coordination throughout the project, which ensured its success.
Ralph Fox
Electrical Designer