Case Study: The GEO Group achieves over $315,000 in annual energy savings with Facility Solutions Group lighting and HVAC upgrades

A Facility Solutions Group Case Study

Preview of the The GEO Group Case Study

FSG Upgrades Lighting and HVAC at 5 Correctional Facilities

The GEO Group, a provider of corrections and detention services, sought to perform energy efficiency upgrades at five of their New Jersey correctional facilities. Their challenge was to modernize their infrastructure to achieve significant energy savings and reduce maintenance costs with minimal operational disruption. Facility Solutions Group (FSG) was engaged to perform the energy efficiency upgrade, which included updating lighting and HVAC systems.

Facility Solutions Group implemented the project by upgrading all interior and exterior lighting to new, efficient technologies and replacing 295 tons of rooftop HVAC units. The results were substantial, yielding over $315,000 in annual energy savings and drastically increasing the lifespan of exterior lighting fixtures. FSG also secured a utility rebate from PSE&G that covered 80% of the project's costs, ensuring a very short payback period for the customer.


Open case study document...

Facility Solutions Group

338 Case Studies