Case Study: King Kullen achieves brighter stores and lower maintenance costs with Facility Solutions Group lighting and controls upgrades

A Facility Solutions Group Case Study

Preview of the King Kullen Grocery Co. Case Study

FSG Upgrades Lighting and Controls in 42 Stores

King Kullen Grocery Co. faced a time-sensitive challenge to upgrade lighting and controls across 42 stores to capitalize on a lucrative, limited-time utility rebate. To complete the project within the six-month deadline, they enlisted Facility Solutions Group to handle the design, supply, and installation of the new systems.

Facility Solutions Group successfully executed the lighting and controls upgrade, which included new fluorescent and LED fixtures. Their rebate management team secured over $2.3 million, covering a significant portion of the project cost and resulting in a payback period of under one year. The results for King Kullen included increased light levels, an improved store appearance, and reduced future maintenance expenses due to the longer life of the new lamps.


Open case study document...

Facility Solutions Group

338 Case Studies