Case Study: Texas Health Resources achieves reliable on-schedule hospital electrical delivery with Facility Solutions Group

A Facility Solutions Group Case Study

Preview of the Texas Health Resources Case Study

FSG Turns to Propel Prefabrication to Keep 2020 Hospital Expansion Project on Schedule

Texas Health Resources needed to expand its Presbyterian Hospital Denton campus with a new women’s care facility to serve a rapidly growing community, requiring a reliable and on-schedule electrical construction project. Facility Solutions Group (FSG) was brought on as the electrical contractor to deliver the complete electrical systems.

Facility Solutions Group leveraged prefabrication and advanced BIM modeling, particularly for the hospital's Central Utility Plant, to streamline complex underground installations. This approach allowed FSG to maintain a tight project schedule and ensure on-time delivery. The result was a modern healthcare facility equipped with a dependable electrical infrastructure to support patient care.


View this case study…

Facility Solutions Group

338 Case Studies