Facility Solutions Group
338 Case Studies
A Facility Solutions Group Case Study
Trinity Terrace, operating a new 32-story retirement facility, required an electrical construction contractor with deep experience and an uncompromising eye for detail for their Trinity Terrace Towers III project. They selected Facility Solutions Group (FSG) to handle the complex electrical work for the state-of-the-art building, which needed to align with strict codes for its various living and care units.
Facility Solutions Group (FSG) first collaborated with project engineers to review and finalize the multifaceted electrical design for the high-rise. They then executed the entire electrical construction scope flawlessly, completing the project on time despite a tight schedule. The result was a successfully delivered facility that met all codes, leaving both the project owner and general contractor very happy with the quality of the work.