Northside ISD, a large school district in Texas, faced the challenge of supporting rapid growth by outfitting a new high school with modern voice, data, video, and security network infrastructure. The district and its general contractor, Joeris, turned to vendor Facility Solutions Group and its in-house Tero Technologies design group to complete the structured cabling work.
Facility Solutions Group conducted site surveys, coordinated installation standards, and managed the full installation of cable pathways and closet build-outs. Following the structured cabling work, the team performed system-wide testing and provided all necessary closeout documentation. As a result, the new John Marshall Harlan High School successfully opened for 2,800 students, providing them with access to the latest technology infrastructure.