Case Study: MD Anderson Cancer Center achieves reliable emergency power with Facility Solutions Group

A Facility Solutions Group Case Study

Preview of the MD Anderson Cancer Center Case Study

FSG Provides Professional Installation of Emergency Power Generators for New MD Anderson Hospital Campus

The MD Anderson Cancer Center required a reliable emergency power system for its new west Houston campus to ensure critical systems remained operational during an outage. The general contractor, Linbeck, engaged Facility Solutions Group (FSG) to install this vital backup power infrastructure as part of a $1.25 million project.

FSG's solution involved professionally installing three 500 kW emergency generator sets. This included supervising the pad site preparation, placing the generators, and making all necessary connections to the switchgear and load banks. As a result, FSG executed the project flawlessly, delivering a fully tested and commissioned system that was successfully handed off to the customer, ensuring the hospital's critical power needs were met.


View this case study…

Facility Solutions Group

338 Case Studies